Eleven years of corporate travel operations, one contract.
We bring your team together on the right route.
One team from planning to the final report.
Operations that scale from 10 to 1,000 people.
For organisations that cannot take the team out of the office, a 10 November commemoration programme set up in your own space. The total duration is 30-45 minutes; the flow is kept plain and contains no celebration element.
We prepare the programme copy, the invitation announcement and the internal communication artwork in language appropriate to a commemoration. We also supply a short suggested text for your organisation's social media post within the same frame — this is where organisations most often go wrong on 10 November.
The quote shows the presentation content and presenter, the exhibition production and installation, and the technical setup and coordination as separate lines. A hybrid broadcast is an optional item. The recommended minimum planning time is 2 weeks; this is the 10 November option that needs the shortest preparation.
30-45 minutes. The flow is kept plain: the moment of silence at 09.05, then a 15-20 minute short presentation and the closing. It creates no significant break in the working day.
Yes. The 09.05 moment of silence can be connected by live broadcast so that it is observed simultaneously at every location. The broadcast setup is tested before the programme; a technical failure during a commemoration is not something that can be made good afterwards.
The content is prepared by us and shared with your organisation for approval. The presentation is based on sources from the period; it contains no commentary and no reference to current politics.
No. 10 November is a day of commemoration; the programme contains no celebration element. Where catering is offered, it is planned as a separate and plain section after the protocol part is complete.
There is no lower limit; it can run for a team of 15 or a multi-site organisation of 2,000. What matters is not the headcount but the number of locations and the broadcast setup.
2-3 weeks is enough. Where a multi-site simultaneous broadcast is built, 4 weeks is recommended for the technical preparation.